Thursday, July 15, 2010

Reports and External Partners

Issue Source: Atlas Helpdesk, Users

Affected Parties: Country Offices, Headquarters,

Categorization: Availability – External Access, Availability – Multi-Language

Data and reports from Atlas are not generally available to external partners. Thus, country offices have to do additional work to provide reports to external partners and external partners do not always receive the information they require in a timely manner. Although the External Access module was rolled out in 2005, it is not used extensively and it does not sufficiently address reporting to external parties. A proper reporting tool, with a proper security management mechanism, running on top of the data warehouse should solve this issue.

There are ongoing plans to roll out the Donor Website to external partners to provide visibility into current and future contributions. Further, row level security is planned for the Executive Snapshot so that access can be provided to external parties. However, there continue to be ongoing concerns over language requirements, since all current Atlas functionality is provided in English only. See related topic on Atlas language.

Management of Queries in Query Viewer

Issue Source: Atlas Helpdesk, Workshops, Networks

Affected Parties: Country Offices, Headquarters

Categorization: Policy – Process Prescription/Procedure

The Query Viewer is used to run pre-defined queries of Atlas data. Because queries are significantly easier to set up and because their output can be directed in multiple forms (Excel spreadsheets, HTML), many have been set up to support data requirements of country offices and headquarters.

The queries available through Query Viewer are often inconsistent and there is little documentation on what queries are appropriate to use in various situations. While some queries are “categorized” and include detailed descriptions, others contain little identification information other than the query name. At times, queries are completely incorrect and thus cannot be relied upon.

Queries are often difficult to find. There is no updated catalog of queries available to users. While Query Viewer now allows queries to be categorized into folders (after the PeopleTools 8.46 upgrade), folders are rarely used for new queries.

Selected users who have attended query training and have passed the certification exam have access to Query Manager, which allows them to create queries. Originally, these users could save queries directly in the production Atlas environment as “public” so that all users could review. Unfortunately, this has contributed to the problem. Public query access has in recent months been restricted to reduce this problem, and all queries must pass a review process before they are publicly introduced in the production environment.

However, problems still remain. First, the review process for making queries public has not been formalized, and thus there are questions on who should approve as well as what criteria there are for approval. Presumably, as queries are approved they should be added to a master listing for user reference. There are also few standards as far as how queries should be categorized into folders. Second, there is still major cleanup needed of existing queries. Queries that are duplicated, give wrong information, or are otherwise unnecessary should be deleted so users are not misled. Third, we often receive individual requests for new queries, but there is currently no procedure in place as to who should review and approve these requests and who should create the new or revised queries.

The risk of this problem can be high, as users could be misled by incorrect or confusing queries, and can thus report wrong information to donors or other external parties.

Report Listing

Issue Source: Atlas User Survey, Atlas Helpdesk, Workshops

Affected Parties: Country Offices, Headquarters

Categorization: Policy – Process Prescription/Procedure

A comprehensive list of reports, description of their purpose, and report navigation is needed. The Management Reporting and Monitoring Tools guide, which was previously developed over a year ago, did provide a good amount of information on reports available and data sources. However, it has not been updated for some time and is becoming less useful as new reports are delivered. Providing updated report information can decrease Atlas helpdesk cases as users learn to help themselves. Further, it can increase the accuracy of reporting information to external counterparties, as users will be encouraged to use the right reports and will understand the data behind them.

The Management Reporting and Monitoring Tools guide is being updated and a new version will be released shortly.

Inaccuracies in Reports

Issue Source: Atlas User Survey, Atlas Helpdesk

Affected Parties: Country Offices, Headquarters

Categorization: Reporting – Report Accuracy

There are often inaccuracies in reports when released to the user community. This is sometimes the case despite various reports using the same sources. The risk of this problem is reporting incorrect information, especially to external parties. Several issue have already been identified and are in the process of being corrected. Better quality assurance and testing of the reports is necessary in the future to prevent future occurrences. Furthermore, reports from similar data sources should be reviewed to ensure their criteria are consistent.

Budget Transaction Detail Report

Issue Source: Atlas User Survey, Atlas Helpdesk

Affected Parties: Country Offices, Headquarters

Categorization: Reporting – Report Accuracy

The Budget Transaction Detail report does not include totals and is missing details for several transaction types. For example, the business unit and voucher id are not shown for realized gain and loss transactions. Because this report pulls from Commitment Control, its use is no longer frequent. Users are encouraged to run project-based reports. Use of the Budget Transaction Detail report is much less frequent as we are encouraging offices to use the Project Transaction Detail, UN_EXP_DETAIL query, GL inquiries and drilldowns, or other reports that retrieve their information from GL and Projects, instead of Commitment Control. This report is primarily useful for reviewing expenditures that were recorded in the budget year, and will not match official expenditure recorded in the CDR. Nonetheless, adding additional detail to this report is considered a future item, but is at a very low priority and will not happen in the near future.

Agency Reporting (Service Clearing Account)

Issue Source: OFA, Agencies, Atlas Helpdesk

Affected Parties: Headquarters, Country Offices, Agencies

Categorization: Reporting – Report Accuracy, Efficiency – Office Organization/User Capacity

The agency report, also called the Service Clearing Account report, is used to report to UN agencies outside of Atlas payments made on their behalf as well as other charges such as billing. The report is issued by headquarters to the agencies, but is often used at the country office level for review and to assist in responding to agency questions.

The Service Clearing Account report was completely redesigned in early 2006. The new report has been used for all 2006 agency reporting. The earlier version of the report had numerous problems, the most substantial being that the same agency charges were often present in the report in multiple months. While these duplicates could be identified because of their attributes, this made reconciliation difficult, and led to a number of concerns with the agencies over whether they were being billed for the same agency activity multiple times. The root cause of this problem was an agency report submission cycle (monthly) that did not match with the Atlas closing cycle (at the time, yearly). To resolve the problem, the report was modified so that activity would be included in the report based on the date it was posted to the ledger. This and the other changes to the report have significantly reduced the number of agency issues that were system in nature. Other changes included better formatting of the report, consistent information across Excel (data file) and PDF versions, specific fields for agency reference and ULO capture, and additional information from transaction sources included in the report.

However, there are still a substantial amount of agency related charges in question, especially from prior years. Office of Finance has been assisting the user community to follow up with the agencies on these questions.

Despite the improvements, there still remain a few issues with the agency report. Currently, the agency reference and ULO fields are not captured directly in either GL journal entries or AR deposits (directly journals). For GL journal entries, users have been requested to use the description fields on the journal to enter this information. While this has been sufficient, there are still complaints that this is not as straightforward or as easy to read as the current voucher and billing activity, where three agency fields are captured separately and presented in their own separate columns on the report. For AR direct journals, there is only one small description field of thirty characters that can be used. This is often too small, and thus agency information is not adequately captured. Country offices often work around this problem by using a suspense account for the deposit, and reversing to the appropriate agency using either a GL journal entry or AP journal voucher. However, this is cumbersome.

A customization to add the agency fields to the AR direct journal and include these fields in the SCA report is in the investigation stage and may be implemented if feasible and cost-effective. This should improve the situation with AR deposits and agencies, which are primarily used for refunds.

At this time there is no plan to change the GL journal to include the three separate fields due to the complexity and cost of customizing the journal. Generally, the existing description fields are at least long enough to capture all of the information. If this becomes a bigger problem in the future, the decision not to customize may be revisited provided funds are available.

Expenditure Reports – Source of Data

Issue Source: Atlas Helpdesk, Workshops, Atlas User Survey

Affected Parties: Country Offices, Headquarters

Categorization: Reporting – Data Synchronization, Reporting – Transaction Data Integrity, Efficiency – Office Organization/User Capacity

The confusion over project expenditure reports often results from misunderstanding of the various data sources in Atlas and the differences between them. There are three primary sources for reports in Atlas: the General Ledger (including sub-system accounting detail), Projects Resources, and Commitment Control. These three sources serve different purposes and thus will not necessarily agree with each other. The various Atlas reports have been designed to pull their information from the most suitable source.

Commitment Control (KK)

  1. Commitment Control is used to manage and control spending against pre-defined budgets. The control of transactions based on available budget and the update of information in the Commitment Control ledgers is handled by the budget check process in each sub-module. There are other processes in the various sub-modules that must take place before a transaction is considered final. And exceptions in these processes, such as a matching exception on a voucher, can sometimes further delay posting to the other data sources. Therefore, while a transaction may be recorded in Commitment Control, it may not be recorded in the other sources of data. And in the end, the transaction may be rejected for other reasons and subsequently removed from Commitment Control.

    Further, budget periods are not closed in the same manner as accounting periods. All information in Commitment Control are recorded based on the budget period and not the accounting period. Therefore, the data in Commitment Control is subject to change after accounting periods have been closed. It is therefore not sufficient for official reporting.

    Commitment Control is best used to monitor current up-to-the-minute spending and available funds, but it is not intended to be used for any reporting to donors, government counterparts, or other outside parties.

  1. General Ledger and Sub-module Accounting Ledgers (GL)
    The General Ledger serves as the official financial record. UNDP’s financial statements are produced from the General Ledger, as are most reports produced for outside parties. Processes such as encumbrance accounting have been developed by UNDP so that the financial information recorded in the General Ledger fully meets the requirements of UNDP Financial Rules and Regulations. While we strive to ensure that postings to the ledger are completed as frequently as possible, exceptions and other issues can sometimes delay posting by days or weeks. The Financial Management Dashboard indicators, data cleanup queries, and the move from a yearly to a monthly closure, however, are all intended to decrease the time it takes from to post to the ledger. Based on current schedules and assuming no exceptions to a transaction, it should now take no more than 2 days for a transaction to be reflected in the General Ledger and associated reports.

    The General Ledger contains not only project related expenditure information but all financial activity for UNDP and its partner agencies, including balance sheet transactions.

    While detail in the General Ledger itself is at an aggregate level, reports and drill-downs link the information back to detailed transactional information that exists in sub-module accounting ledgers. We collectively refer to the General Ledger itself as well as the sub-module accounting ledgers to be the “General Ledger” source in reports.

  1. Projects Resource Table (PRT)
    The Projects Resource table contains financial information associated with projects. Unlike the actual General Ledger, information in the Projects Resource table is not aggregated, but is at a detailed transactional level. Further information on finalized project budgets is available from the Projects Resource table. For this reason, many reports on the financial status of Projects are developed from the Projects Resource table. Generally, expenditure information in the Projects Resource table should match expenditure information from the General Ledger. However, there are some exceptions including realized gains and losses and encumbrances. These exceptions are discussed in more detail below.

    The existence of the Projects Resource as a separate data source from the General Ledger is due to decisions made by PeopleSoft as the vendor of the Atlas solution. In many other PeopleSoft implementations only a sub-set of expenditures are related to projects. However, at UNDP all expenditures are tied to a project, even administrative costs. The Projects Resource table is intended to provide a single source for project-related information with appropriate transaction details for analysis. Further, it contains activity level detail, which the General Ledger does not unless also including the associated journal and sub-system activity. However, PeopleSoft has also chosen not to include some information such as realized gains and losses in Projects. We have therefore made use of this table in number of situations as it can provide more detailed information without as much expense in system performance.
    There are 3 core reports on project financial activity in ATLAS: Combined Delivery Report (CDR), Cost Sharing Apportionment (CS) and the Project Budget Balance Report (PBB). In addition, some new reports have been released recently such as the Quarterly Progress Report and Periodic Expenditure report.

The CDR is UNDP’s official project expenditure report. It provides information at the aggregate level and does not contain transactional level details such as journal ids or voucher ids. The CDR retrieves its information from the General Ledger source. Users can use the GL-based queries and inquires to drilldown to the detail transactional level. However, many users are unfamiliar with this approach. Instead many offices use the UN_EXP_DETAIL query and Project Transaction Detail to analyze their official expenditures. The information in these detail queries/reports come from a different source than the CDR, the Projects Resources table. Due to the differences in sources described below, however, this detail may not exactly match the GL information reflected in the CDR.

The Cost Sharing Apportionment (CS) report, like the CDR, uses the General Ledger as its source. The CS report is used to identify and resolve any deficit at the fund/project/donor level. It should always match the information in the CDR since both reports utilize the same source.

The Project Budget Balance (PBB) report uses the Projects Resource Table as its source. Therefore, it may not exactly match the information in the CDR or CS reports. However, the UN_EXP_DETAIL query and Project Transaction Detail, which show detailed transactional information, will both agree with this report since they all use the Projects Resource Table as the source.

The differences between the two sources, the General Ledger (CDR/CS reports) and Project Resources Table (PBB report) include the following:

  1. Data Source Timing
    There may be slight timing differences between posting to the General Ledger and posting to the Project Resource Table. The Project Resource Table posting is automatic on a nightly basis. The General Ledger posting in the past was done on a weekly basis, but is now typically posted on a daily basis. However, there are occasionally journal errors on one transaction that may prevent a larger set of transactions from posting until resolved. This may add a slight delay to the posting process. Therefore, it is sometimes necessary to wait a few days before both sources are fully updated.

  1. Differences in Encumbrance Calculation Methodology
    CDR and PBB will show some differences in calculated encumbrances based on differences in encumbrances in the GL and Projects Resources Table. The encumbrances (also known as un-liquidated obligations) in the GL are created by the Encumbrance Accounting process based on the UNDP Financial Rules and Regulations. The Projects encumbrances are based on a delivered solution provided by PeopleSoft. Though both the PBB and the CDR should include the same POs, the USD equivalent will not match because the encumbrances in the GL are revalued where as the encumbrances in Project Resources Table retain the original USD equivalent value.

  1. Double counting of expenditure
    Due to the design of the Encumbrance Accounting process, all GL based reports will have a “double counting” problem because of encumbrances. This is because encumbrance accounting process is only run periodically and posted similar to an accrual. But the reversal of that accrual is not posted until the next iteration of encumbrance accounting. If the PO is paid through a voucher during the period following the last Encumbrance Accounting run, both the PO and the voucher will record the expenditure, and the PO expenditure will not be reversed until the next run of Encumbrance Accounting. This means that any expenditure report from the GL is only accurate if run as of the period end date after encumbrance accounting is run: 30 June, 30 Sep or 31 Dec (after encumbrance accounting has been run for these dates) This ensures that the accurate encumbrance for that period is recorded as well as any vouchers, without any “double counting”.

  1. Differences in Realized Gain and Loss
    GL-based reports such as the CDR include realized gain and loss whereas PBB does not. The FX gain/loss represents the difference between the USD equivalent of a voucher as of the invoice date of the voucher and the USD equivalent of the payment as of the accounting date of the payment. This information is not carried over into the Projects Resource Table and is therefore not reflected in the Project Budget Balance report. The impact is more pronounced for countries with higher volatility in exchange rates versus the US dollar.

  1. Small Rounding Differences
    The method in which non-USD transactions amounts are converted from the Accounts Payable is slightly different in Projects than it is in the General. This will sometimes result in very small differences in amounts between GL-based reports and Project Resource-based reports. The amount differences are usually less only a few cents and are never more than 1 USD. Therefore, these differences are not material and typically do not present reconciliation problems.

  1. Differences in Encumbrance Due to Accounting Date when Closing Purchase Orders
    Encumbrances on the PBB are incorrect when offices close POs and do not enter the correct accounting date in the workbench. This may result in remaining encumbered funds that are returned in the wrong year (or wrong quarter). Typically this occurs when prior year purchase orders are closed shortly after the end of the year but before the prior year is closed. This is because the default accounting date used is the current date, and offices often do not realize they need to change back to the end date of the prior year. Since encumbrance accounting operates based on the status of a PO only (and closed POs are not recorded as open obligations), the funds are returned in GL based reports in the prior year as they should be since the PO is marked as closed. But the PBB will show the funds returned in the following year. Use of the proper accounting date has been emphasized at the recent BOM Regional Workshops and will also be noted on the networks as year-end approaches.

The typical supporting document for the CDR is the query UN_EXP_DETAIL or the Project Transaction Detail report which are based on the Projects Resource Table data source. The Project Transaction Detail report is identical to the query but can be scheduled and is better formatted for readability. Users run these reports and, using Excel, summarize the results by account code. Sum the totals for the analysis types UNACT, UNFEE, and compare to the CDR. There will however be the differences as this query is extracted from the Project Resources Table. These differences, described in detail above, usually relate to encumbrances or to realized gain or loss. Encumbrances can be separated from other expenditures because they have their own analysis group, UNCOM, in the report. Realized gains and losses can be separated via the account.

Many of the inconsistencies between the data sources result from the differences between standard system setup and UNDP policies. While ideally we would like to make the data sources as close as possible, making the sources exactly match would be impossible without costly customizations. Unique financial policies such as the requirement to record purchase order obligations against the ledger also contribute to the problem. Users also contribute to the data problems by using wrong accounting dates when closing purchase orders; wrong accounts in the transactions, etc.

Donors and project counterparts will often question expenditure numbers. Often users become confused when looking for supporting details due to the differences in the various sources. This exposes us to the financial risk as well as to the wrong image.

UNDP has taken several measures to help reduce the problem:

  1. Conducted numerous trainings to explain the various differences between data sources
  2. The LRC and various BOM departments have updated OnDemand training content with information on reports and the impact of system tasks on reports.
  3. Distributed information on reading and understanding reports on the Finance Network, the Regional Support Team (RST) web site, and other areas.
  4. Made updates to existing reports in order to reduce inconsistencies. For example, Project Budget Balance was updated to more accurately report encumbrances (although these encumbrances still may not match the official encumbrances in the ledger).
  5. Created reporting databases extracting data from the appropriate source. This reporting database is used by certain ATLAS reports and the Atlas Executive Snapshot.

Unfortunately, when Atlas was initially configured, little attention was given in configuring the module for the eventual reporting requirements of headquarters and country offices. Most of the attention on reporting began after transactions already began to be captured in the system. Therefore, the system configuration doesn’t always match the needs of the user community in terms of reporting. We have managed to work around many of these problems by using unique methods of reporting. But some of these methods have a cost in performance may not be the best approach longer term. The move to IPSAS and the possible upgrade of Atlas Financials to a newer version of PeopleSoft will provide some opportunity to revisit those decisions and make adjustments when needed.

For example, the move to IPSAS will eliminate the current Encumbrance Accounting process and will likely eliminate much of the mismatch of expenditures between the General Ledger and Project Resource Table expenditures. And the upgrade of Financials may provide better reporting of activity-level details from the General Ledger.

Wednesday, July 14, 2010

CNN: - Video: Aid in Haiti going to waste?

Dr. Sanjay Gupta | BIO
AC360° Contributor
CNN Chief Medical Correspondent


CLICK HERE FOR STORY

UN's internal watchdog faces leadership vacuum

UNITED NATIONS — The leader of the agency that is supposed to root out corruption in the United Nations is stepping down Wednesday with no successor in sight, adding to fears that the U.N. is becoming less capable of policing itself.

With the departure of Inga-Britt Ahlenius, head of the Office of Internal Oversight Services for the past five years, three of the agency's four top jobs are unfilled. American and U.N. officials and watchdog groups are concerned that the U.N. is compromising its ability to prevent another scandal like the $1.8 billion bilked from the U.N.-run oil-for-food program in Iraq.

"The United States has consistently and aggressively pushed for a strong and independent Office of Internal Oversight Services to uncover fraud, waste and mismanagement at the U.N., but we are disappointed with the recent performance of its investigations division," said Patrick Ventrell, a spokesman for the U.S. Mission to the U.N.

"We have been crystal clear with the U.N. at the highest levels that the coming change in OIOS leadership must bring about a significant improvement in its performance to increase oversight and transparency throughout the organization," he told the AP, using the initials of the oversight office.

Interviews with OIOS officials and documents uncovered in Associated Press investigations portray a demoralized office whose staff lacks confidence in the management's leadership.

Despite a General Assembly resolution last December urging Secretary-General Ban Ki-moon to ensure that a successor was appointed before Ahlenius' term expired, none has been named and no indication has been given of when that will happen.

Asked by AP about the prospects for replacing Ahlenius, Angela Kane, the U.N.'s undersecretary-general for management, said July 1 that "a very intensive search" is under way.

Ahlenius declined interview requests and said by e-mail she will submit her end-of-assignment report to Ban on Wednesday, her last day on the job.

Another OIOS leadership position — the directorship of its investigative division — has been vacant since 2006. That unit's investigators were told, in a document obtained by the AP, not to open cases of financial fraud or corruption involving U.N. vendors or former staff — a reversal of past policy. Separately, they were ordered not to follow up on or to quickly close out investigations already launched by the U.N. Procurement Task Force when it operated from 2006 through 2008, according to OIOS officials speaking on condition of anonymity because they said they feared reprisals.

The Procurement Task Force, set up in the wake of the oil-for-food case, was headed by Robert Appleton, a veteran former U.S. federal prosecutor who was special counsel for that inquiry. It was disbanded at the end of 2008 under pressure from some governments that protested findings of wrongdoing involving citizens or companies from their nations.

The General Assembly had directed Ban and Ahlenius to ensure that the task force's caseload and capacities were transferred to OIOS' investigation division.

But since the start of 2009, the U.N. under Ban has cut back sharply on investigations into corruption and fraud within its ranks, shelving cases involving allegations of theft or misuse of millions of dollars, an AP investigation in January showed.

Many of the Procurement Task Force's completed investigations included urgent recommendations to turn over evidence to prosecutors in the countries concerned, but Ban's office rarely did so. The U.N. has no prosecutorial powers.

Since the start of 2009, Ban's office has referred one major case outside the U.N., according to U.N. officials, diplomats and figures supplied to AP by the U.N.'s legal office. Some major reports also remain sealed from public view, for no publicly stated reasons.

Last month, when asked by the AP to respond to the allegations and detail the U.N.'s anti-corruption efforts, Ban replied only that "addressing corruption as a way of enhancing good governance — that is a very important area — the United Nations is putting emphasis on that."

However, David Walker, the former U.S. comptroller general who now chairs the U.N.'s Independent Audit Advisory Committee, told AP he fears OIOS will be relegated to "a caretaker status" under the temporary oversight of the U.N.'s legal chief, Patricia O'Brien.

"Frankly, my bigger concern now is the leadership vacuum that exists in OIOS because Ahlenius' term ends this month, and it's very unclear what the status of the search is for a successor," said Walker, whose committee advises the General Assembly on accountability issues.

"And, furthermore, the heads for the investigation division and the evaluation and inspections division are still open," Walker said. "There are recommendations that have been pending with the secretary-general's office for an extended period of time — and just no response whatsoever."

Appleton was twice unanimously selected by an independent U.N. panel to head the investigations unit, and was among the more than 70 applicants who responded to worldwide advertising for a candidate. He was Ahlenius' choice for the job, but when asked why he hasn't gotten the job, Ban's office and Kane said the list of applicants lacked diversity.

In the absence of a permanent director, the investigation division is run by an acting director, Michael Dudley, a career U.N. official. The department's management under his tenure was criticized by some employees of the 70-strong division in a survey of staff in late 2008 obtained by AP.

Of 52 respondents, 47 percent said the management operates with integrity and 41 percent said it doesn't. The rest had no opinion. About three-fifths described the office as having low morale, ineffective leadership and unfair promotion practices.

In a Nov. 24, 2008, e-mail to senior staff, Dudley said the survey contained "some expected comments, some of which are very personal and related to my integrity and performance." He noted "most of the negative comments about me show a lack of trust," but said he hoped to change that.

The Government Accountability Project, a Washington-based nonprofit law firm, has previously represented at least one OIOS investigator who filed a whistleblower complaint alleging retaliation by Dudley.

Bea Edwards, the firm's international program director, told the AP that Dudley "does not seem to have been able to really pursue and close the tough cases that were left there by the Procurement Task Force."

"Many serious cases of substantial corruption have simply been closed or languished in that division under his management," she said.

The AP's investigation, based on U.N. documents and interviews with officials, found that Dudley has a record of closing cases before investigations were complete and has not actively pursued the initiatives begun by the Procurement Task Force. These include plans to investigate all five of the U.N.'s economic commissions around the world.

He also has cut back on investigators experienced in financial fraud and corruption and ditched other resources including former task force investigators and a task force contract that provided expert forensic support services.

Dudley, a 47-year-old Kentuckian, was hired as a deputy director of the investigative division in 2007. He declined to be interviewed, but in response to detailed questions, he told AP by e-mail he considers every investigation to be significant. He said his division looks into allegations of fraud, bribery and embezzlement and "a wide range of matters beyond."

What is the legal basis of United Nations peacekeeping operations?



One of the most prominent activities of the United Nations is its peacekeeping operations; or in some cases, lack of them. In fact, the term ‘peacekeeping operations’, is now synonymous with the United Nations, and yet the United Nations Charter does not mention, even once, the phrase ‘peacekeeping operations’.


Since the founding Members were just emerging from World War II, the enforcement measures mentioned in the Charter referred to war between states, more specifically against ‘aggressors’.


Hence the reference in Article 39 to the Security Council having powers to ‘determine the existence of any threat to the peace, breach of the peace, or act of aggression’ should be understood in this context as intended to refer to inter-state conflict or war.


This interpretation is confirmed by Article 2 (7) which states that ‘nothing contained in the present Charter shall authorize the United Nations to intervene in matters essentially within the domestic jurisdiction of Members or shall require the Members to submit such matters to settlement under the present Charter’.
Apart from the Korean War and the first Gulf conflict, only very few of the United Nations missions set up to address conflicts early on in the Organization’s existence approximated the conflicts envisaged by the founding fathers of the United Nations i.e., inter-state conflicts.


These were the United Nations Truce Supervision Organization (1948), the United Nations Military Observer Group in India and Pakistan (1949), the United Nations India-Pakistan Observation Mission (1956) and the United Nations Disengagement Observer Force (1974).


The inter-state character of these Missions was clear from the designations of the missions. The missions usually bore the names the feuding countries involved; were specifically assigned ‘truce supervision’ as their purposes of or were termed ‘disengagement observer force’.


The majority of the later United Nations Missions have operated ‘intra-state’ and seemingly in violation of the principle of the the domestic jurisdiction of states.


What then is the legal basis of these ‘peacekeeping operations’?


The United Nations peacekeeping is ‘a unique and dynamic instrument developed by the Organization as a way to help countries torn by conflict create the conditions for lasting peace’.


Clearly, peacekeeping operations, to the benefit of peace nevertheless, largely require the United Nations to involve itself in matters essentially within the domestic jurisdiction of Members, something not intended by the Charter.


Again, in the words of the United Nations, Dag Hammarskjöld, the second United Nations Secretary-General is said to have captured this ‘legal grey area’ by saying that peacekeeping operations belonged to "Chapter Six and a Half" of the Charter, placing the operation between traditional methods of resolving disputes peacefully, such as negotiation and mediation under Chapter VI, and more forceful action as authorized under Chapter VII.


After all, having died overseeing the first United Nations mission in Congo in 1961, he is considered to be the father of peacekeeping operations.

UN eyes private help in $100 billion climate aid

UNITED NATIONS — A pledge by rich nations in Copenhagen to provide as much as $100 billion a year of climate-related aid to developing countries by 2020 may depend in part on the generosity of private donors and other non-governmental sources.

Secretary-General Ban Ki-moon said Tuesday that his panel of advisers — seeking ways to fulfill a U.N. climate summit's pledge in the Danish capital last December — was considering private sources to deliver some of the aid promised to help developing countries deal with rising sea levels, drought and other effects of rising temperatures.

The panel chaired by prime ministers Meles Zenawi of Ethiopia and Jens Stoltenberg of Norway have been meeting this week to devise ways to set up a $30 billion annual fund by 2012 that would increase to $100 billion a year by 2020.

The panel also includes billionaire George Soros, White House economic adviser Lawrence Summers, the president of Guyana and ministers from Britain, France, Mexico, Singapore and South Africa.

"The challenges will be great," Ban told reporters. "They have to first of all identify the sources of resource — whether it comes from public funding or private funding. I suspect that to generate $100 billion, both private and public funds would be necessary."

He did not specify, however, what sort of private funds might be sought — individual, corporate or other sources.

Ban's advisory panel on climate financing said it plans to submit a final report in October on how to set up the fund.

Separately, Chris Huhne, Britain's energy and climate secretary, told reporters that private finance would be "absolutely key, because so much of the mitigation agenda is about what is effectively a new industrial revolution in all of our countries, in the developing world and the developed world."

He said the financing options under consideration include grants and aid from rich nations, some forms of government, bank or private lending and new taxes on shipping or aviation.

The fund was a key part of the nonbinding "Copenhagen Accord," an agreement brokered by U.S. President Barack Obama with China and others that signaled a new start for rich-poor cooperation on climate change.

The accord urged deeper cuts in emissions of carbon dioxide and other gases blamed for global warming, but did nothing to demand them. The next hoped-for step, a legally binding international treaty requiring further emissions cuts by richer nations, remains an elusive goal of U.N. negotiations.

"Frankly, if we don't get the finance credibly right, if we don't come up with a set of packages or a package which the developing countries can clearly see is a real, effective, credible effort to meet the commitments that we've made, then I don't think that there is going to be a global deal," Huhne said.

One of most concrete actions was the pledge by richer nations to finance a $10 billion-a-year, three-year program to fund poorer nations' projects to deal with drought and other climate-change impacts, and to develop clean energy.

They also set a "goal" of mobilizing $100 billion-a-year by 2020 for the same adaptation and mitigation purposes.

Among those most affected by rising temperatures, the 11 nations that make up the Pacific Small Island Developing States expressed frustration Tuesday over the pace of progress in getting the promised climate aid.

The group said in a statement it fears the aid will get held up in "bureaucratic red tape" or the promised "new and additional" money from rich nations will wind up being existing development aid that is simply repackaged.

The Failure of the Live Aid Model

Click here for more


Better government is the key to preventing famine.

Twenty-five years ago yesterday, rock stars and charity organizers from both sides of the Atlantic came together for an unprecedented fund-raising event. Simultaneous concerts at London's Wembley Stadium and JFK Stadium in Philadelphia were joined via satellite linkup for a global television audience. Ethiopians were suffering from dire famine, and promotional posters proclaimed this would be "The day the music changed the world." They called it Live Aid.

In monetary terms, the event was considerably more successful than expected, raising £150 million ($283 million). There was an extended round of global self-congratulation and a knighthood for organizer Bob Geldof. More ...